    C.N.M Scaffolding was appointed by PH Beck to provide access scaffolding for external repair works at Hordern House in Horsham.

    The scope ran across the whole building rather than one elevation. Fascias, soffits, high level gables and rainwater goods all needed working on, and those are not jobs that can be reached from a tower or a ladder. They sit at the top of the wall, at the edge of the roof and in the awkward corners where two roof planes meet, which means the only practical approach is a scaffold that reaches every one of those points at once.

    Hordern House is not a single building. It is a run of linked blocks arranged around courtyards, fronting a public green with a footpath along it and a playing field beyond. Scaffolding it meant following that footprint around every return and every change of roof line, and keeping the courtyards and the footpath usable while the work went on.

    The structure was double boarded throughout and sheeted with debris netting backed by polythene, so that material coming off the fascias and gables was contained on the scaffold rather than reaching the gardens, the footpath or the green.

    Ties were pull tested as required, which on a building of this length and this many returns is the difference between a scaffold that is assumed to be secure and one that is proven to be.

    This project utilised our safe access scaffolding, commercial scaffolding and edge protection & handrails services, delivered to our full range of industry accreditations and safety standards. The project was located in Horsham, one of our key service areas across the south coast.

    Project Challenges

    Scale was the first problem. This is an extensive building and the works touched every part of its external envelope, so there was no option to scaffold one section, finish it and move on. The access had to exist across the whole run at the same time.

    The second problem was the shape. A single rectangular block is straightforward. A set of linked blocks around courtyards is not, because every return, every junction between roof planes and every change in height is a point where the scaffold has to be designed rather than repeated. High level gables in particular sit where two roofs meet, which is the hardest place on any building to reach from a standard elevation scaffold.

    The third was the setting. The building fronts a public green with a footpath running along it, and the courtyards behind are in everyday use. Work on fascias, soffits and rainwater goods produces a constant fall of small material rather than one big strip, which is exactly the kind of debris that travels if it is not contained. That is why the whole structure was netted and lined rather than fanned in places.

    Tying a scaffold to a building with this many returns also puts more load through more ties than a flat elevation would. Pull testing them was not a formality here, it was how the structure was signed off as sound across its full length.

    Health & Safety

    The scaffold was double boarded throughout, giving a full working platform at every lift rather than a single boarded run.

    Debris netting was installed with polythene sheeting behind it across the structure, containing material coming off the fascias, soffits, gables and rainwater goods and protecting the courtyards, the footpath and the green below.

    Ties were pull tested as required, confirming the structure was secured to the building to the necessary standard across its full length rather than assumed to be.

    The scaffold was inspected at the statutory intervals for the duration of the hire. All operatives are CISRS certified.

    Key Highlights

    Access across an extensive linked complex rather than a single elevation
    Fascias, soffits, high level gables and rainwater goods all reachable at once
    Double boarded throughout
    Debris netting with polythene sheeting across the structure
    Ties pull tested as required
    Courtyards and the public footpath kept in use
    Completed for repeat client PH Beck

    Conclusion

    PH Beck had continuous access to every fascia, soffit, gable and rainwater run on an extensive building, with the courtyards and the public footpath in front of it still usable throughout.

    PH Beck are a repeat client. C.N.M Scaffolding has also worked with them at Victoria Court in Horsham, The Eardley on Worthing seafront, The Old Dairy in Littlehampton, and on a designed independent access scaffold for render works in West Sussex.

    Project Gallery

    The scaffold running the length of the linked blocks, seen from the green
    Following every return and change of roof line across the complex
    The full extent of the access scaffold across the courtyards and roofs
    The netted elevation seen from the public green and footpath
    Netting and double boarding above the boundary wall, with a C.N.M lorry on site
    Two wings from a courtyard, with residents using the garden below
    The rear elevation running towards the playing field

    Ready to Start Your Project?

    Contact us today for a free, no-obligation quote