
Straight answers to the questions we get asked most, written from our own jobs rather than from a template.

Scaffolding is priced as one figure covering design, delivery, erection, the hire period and the dismantle. Here is what moves that figure, and what published guides say the range is.
Read the guide
One elevation of a two storey semi is about half a day. But the question most people mean is how long the scaffold will be standing outside, and that answer is much longer.
Read the guide
A scaffold must be inspected before first use, then every seven days, and again after anything affecting its stability. The legal duty sits with the employer controlling the work.
Read the guideContact us today for a free, no-obligation quote