A scaffold used for construction work must be inspected by a competent person before it is used for the first time, then at intervals not exceeding seven days, and again after anything likely to have affected its strength or stability. The legal duty sits with the employer who controls the work, not automatically with the firm that erected it.
That last sentence is the one that surprises people, and it's the reason this page exists.
The requirement comes from the Work at Height Regulations 2005. Regulation 12 covers inspection of work equipment, and the Health and Safety Executive's guidance applies it to scaffolds in plain terms: a scaffold used for construction should be inspected before first use and then every seven days until it is removed.
Regulation 12 also defines what an inspection is. It's a visual or more rigorous check by a competent person, and the result has to be recorded and kept until the next inspection is recorded. That inspection time is part of what a scaffolding quote covers.
The seven day interval isn't the whole rule. An inspection is also needed after any event likely to have affected the structure. In practice that means high winds, an impact, an alteration, or anything that has moved or damaged part of the scaffold. A gale on a Tuesday doesn't wait for the Monday inspection.
The duty under the regulations falls on the employer who controls the work at height, which usually means the main contractor or the person the scaffold was provided for.
This catches people out, because the assumption runs the other way. The scaffolder built it, so surely the scaffolder inspects it. The scaffolder will inspect their own structure, and a reputable one will do so throughout the hire. But if your trades are working off that scaffold, the responsibility for it being safe to use that day does not transfer away from you.
In practice the arrangement is normally agreed at handover, and it should be written down rather than assumed.
A competent person is someone with the knowledge, experience and training to spot the defects that matter and judge their significance.
It doesn't have to be a scaffolder. The HSE is explicit that a non scaffolder who has attended a suitable scaffold inspection course and has the relevant background experience can be competent to inspect a basic scaffold, a site manager being the usual example.
Complex or designed structures are a different matter. A scaffold bridged over an opening, hung from a building, or built to its own design needs someone whose competence matches what they are looking at.

No. The HSE is clear that scaffold tags are not required by law.
A tag is a useful way of showing at a glance that a scaffold has been checked and is safe to use, and many sites run them for exactly that reason. But a tag is a convenience on top of the record, not the record itself. What the regulations require is the inspection and the report, kept until the next one.
A scaffold with a current tag and no inspection report doesn't meet the requirement. A scaffold with a full report and no tag does.
| Question | Answer |
|---|---|
| Before first use | Yes, every time |
| Routine interval | At intervals not exceeding 7 days |
| After high winds or an impact | Yes, before the scaffold is used again |
| After any alteration | Yes, before the scaffold is used again |
| Who can inspect | A competent person, not necessarily a scaffolder |
| Is a tag required by law | No |
| Is a written report required | Yes, kept until the next one is recorded |
| Who holds the duty | The employer controlling the work at height |
An inspection is looking for the things that would make the structure unsafe to stand on or work from.
| Area | What's being checked |
|---|---|
| Foundations | Base plates and sole boards, whether anything has sunk or moved |
| Structure | Standards, ledgers, braces and couplers, anything missing |
| Ties | Number, position and condition of the ties into the building |
| Platforms | Boards complete, undamaged and properly supported |
| Edge protection | Guardrails and toeboards at every working level |
| Access | Ladders, their fixings and any ladder guards |
| Sheeting | Netting and polythene, which add wind load and can tear |
The most common defect isn't a dramatic one. It's a missing component, usually removed by another trade to get a window or a sheet of plasterboard past, and never put back.
The report needs to identify the scaffold, say when it was inspected and by whom, record what was found, note anything that needs putting right, and be kept until the next inspection is recorded.
If a defect is found that could endanger anyone, the scaffold should not be used in that condition until it has been corrected.
Any alteration restarts the clock. The structure that was inspected is no longer the structure in front of you.
This includes alterations made by people who aren't scaffolders. A tie removed to fit a window, a board lifted to run a cable, a guardrail taken out for access. On a job like Hordern House, where the ties were pull tested across the full length, that matters more than it looks. Each of those changes a structure that was signed off as safe, and each needs the scaffold re-inspected before it is used again.
The practical rule on site is simple. Nobody alters a scaffold except the scaffolder.
If the scaffold is outside your house rather than on a construction site, the duty under the regulations sits with whoever controls the work. In practice that is usually the builder or roofer you have engaged, not you.
What you should see anyway:
| At | What to expect |
|---|---|
| Handover | The scaffold finished, inspected and confirmed as ready to use |
| During the hire | Inspections at intervals of no more than seven days |
| After a gale | A check before anyone goes back on it |
| If anything changes | The scaffolder back, not another trade with a spanner |
If something looks wrong, a board missing, a tube knocked, a base plate sitting off its sole board, ring the scaffolder rather than the builder. We would always rather come and look at nothing than hear about it afterwards.
Every scaffold we erect is inspected at the statutory intervals for the duration of the hire, and all of our operatives are CISRS certified. You can see our accreditations in full.
We work across West Sussex, Brighton and south Hampshire. If you are a contractor and want the arrangement set out clearly before anything goes up, ask us at the quote stage and we will put it in writing with the handover.
This page summarises the Work at Height Regulations 2005 and the Health and Safety Executive's published guidance as it stood in November 2026. It's written to help you ask the right questions. It isn't legal advice, and where your duties are unclear you should check the current HSE guidance or take advice.
Written by The C.N.M Scaffolding team
Scaffolding contractors, West Sussex, Hampshire and Sussex
This guide was written from our own completed jobs rather than from a template. All of our operatives are CISRS certified. Where a figure comes from somewhere other than our own records, the source is named on the page.
Tell us the address and what the works are, and we will come and look. No charge for the visit.

Scaffolding is priced as one figure covering design, delivery, erection, the hire period and the dismantle. Here is what moves that figure, and what published guides say the range is.

One elevation of a two storey semi is about half a day. But the question most people mean is how long the scaffold will be standing outside, and that answer is much longer.