East Preston Fire Station scaffolding project in East Preston

    East Preston Fire Station

    Richard Soan Roofing Services LtdEast PrestonAccess scaffold for roof works over operational appliance bays

    Project Details

    C.N.M Scaffolding provided access for roof works at East Preston Fire Station, a West Sussex Fire and Rescue Service station on the West Sussex coast, working for Richard Soan Roofing Services.

    A fire station is one of the few buildings that genuinely cannot be shut. Whatever is happening to the roof, an appliance has to be able to leave through the front doors at any hour, at speed, without anyone moving anything first. That single requirement shapes the whole scaffold.

    The station is a flat roofed block with two appliance bays across its frontage, adjoined by an older pitched roof building in flint and brick. The scaffold runs at roof level across both, so a roofing gang can reach a modern flat roof and an older pitched one from a single structure instead of two.

    Across the bay openings the scaffold is carried on beams. The standards land on the piers between and beside the bays rather than in the openings, so each bay door is left clear to its full width and full height. Nothing stands in the path of an appliance.

    This project utilised our commercial scaffolding, safe access scaffolding and design & calculations services, delivered to our full range of industry accreditations and safety standards. The project was located in East Preston, one of our key service areas across the south coast.

    Project Challenges

    The bay doors were the whole problem. Scaffolding a frontage normally means putting standards along it at regular centres, and here the two places you cannot put a standard are precisely the two openings the building exists to use.

    Beaming over the openings solves it, but it changes the structure. The load that would have gone straight down through standards in front of the doors is instead carried sideways to the piers, so those points take more than they would on an ordinary elevation.

    The second problem was that the station stayed in service while the scaffold stood. The forecourt is where appliances manoeuvre, and it is also where the scaffold had to be built from. Everything at ground level had to be positioned, guarded and fenced on the assumption that a vehicle could need to come through at any moment.

    The third was that the works touched two buildings of different ages and different roof types, a modern flat roof over the bays and an older pitched tiled roof alongside, which have to be reached from one continuous structure rather than two separate scaffolds.

    Health & Safety

    The standards at forecourt level were sleeved in yellow guarding, making the tubes clearly visible to drivers manoeuvring appliances on a surface they share with the scaffold.

    The working area was enclosed in Heras fencing carrying a site safety board, separating the scaffold from the operational part of the forecourt.

    The appliance bay openings are clear to full width and full height, because the scaffold is beamed over them rather than standing in them.

    The scaffold was inspected at the statutory intervals for the duration of the hire. All operatives are CISRS certified.

    Key Highlights

    Appliance bays kept clear to full width throughout
    Scaffold beamed over both bay openings
    Roof works to a flat roof and an adjoining pitched roof from one structure
    Yellow guarding to every standard at forecourt level
    Heras fencing separating the works from the operational forecourt
    Station still in use while the scaffold stood
    Repeat work for Richard Soan Roofing

    Conclusion

    The roof works were carried out across both the modern appliance bay block and the older pitched roof building beside it, from one structure, without closing either bay.

    An appliance and a response vehicle are parked on the forecourt in the photographs taken while the scaffold stood.

    Richard Soan Roofing are a repeat client. C.N.M Scaffolding has also scaffolded their roof works at Vale School in Worthing and at the Fordwater Building, Chichester High School.

    Project Gallery

    Both appliance bays beamed over, leaving each one clear to full width
    The forecourt with an appliance parked, Heras fencing and the site safety board