C.N.M Scaffolding erected an independent access scaffold at Vale School in Worthing to form access for roof works, on behalf of Richard Soan Roofing Services, a repeat client.
The word that matters here is independent. An independent scaffold carries its load through its own standards rather than through the building, which matters on a structure like this one. Vale School is a run of single storey blocks with flat roofs and panelled walls, so the scaffold had to be self supporting along its whole length.
That independence has to be paid for in stability, which is where the tied back rakers come in. The rakers run out from the structure at an angle onto sole boards and are tied back, bracing the scaffold against movement.
The working platform sits at the flat roof edge. Double edge protection was fitted, giving the roofing trades a guarded edge to work from on a roof that has no parapet and no natural barrier at all.
This project utilised our safe access scaffolding, edge protection & handrails and commercial scaffolding services, delivered to our full range of industry accreditations and safety standards. The project was located in Worthing, one of our key service areas across the south coast.
A primary school playground is not a compound. The scaffold stands on painted play surface, beside the markings and the equipment the children use, with a sports pitch beyond it and buildings on both sides of a narrow walkway. Everything that goes down has to go down where something else already happens.
The rakers are the clearest example. They project out from the building at an angle into exactly the space a playground uses, and they do it at the height a running child meets first. That is why every raker and every low level standard on this scaffold is wrapped in yellow foam guarding from the sole board up.
The yellow is doing two jobs. It pads the tube, so a knock is absorbed rather than taken on bare steel. It also makes the tube impossible to miss against a grey wall and a dark playground surface, which is the part that stops the collision happening in the first place. The sole boards underneath spread the load across the playground rather than point loading it.
Flat roofs bring their own problem. There is no ridge, no pitch and no parapet to work behind, so the only thing between an operative and the edge is the protection the scaffold provides. That is why it is doubled rather than single.
The access had to run the length of the block and round the return into a walkway barely wider than the scaffold itself, which leaves no room to set the structure back from the wall.
Every C.N.M operative on this site held the DBS checks required to work in a school environment. On a school, that is not an extra, it is the condition of being allowed on site at all.
Double edge protection was fitted at the working platform, giving a guarded edge along a flat roof with no parapet.
The rakers supporting the structure were tied back and stood on sole boards, spreading the load across the playground surface.
Every raker and low level tube reachable from the playground was sleeved in yellow foam guarding, padding the steel and making it clearly visible at child height.
The scaffold was inspected at the statutory intervals for the duration of the hire. All operatives are CISRS certified.
The roofing trades had a stable working platform at flat roof level with a guarded edge, from a structure carrying its own load.
Richard Soan Roofing are a repeat client. C.N.M Scaffolding also provided the independent access scaffold for their roof works at the Fordwater Building, Chichester High School, another live school site.
Scaffolding on other live education sites, all carried out by enhanced DBS checked operatives.

Independent access scaffolding and temporary roof for school roofing works.
View Project
Independent access scaffold at a live secondary school for roof repairs.