The Queens Hotel, Brighton scaffolding project in Brighton

    The Queens Hotel, Brighton

    BrightonFull access scaffold for remedial works

    Project Details

    C.N.M Scaffolding erected a full access scaffold at The Queens Hotel on the Brighton seafront, supporting a programme of remedial works that included detailed window repairs and roof maintenance.

    The scaffold runs the full height of the building and turns the corner, so that both the front elevation facing the sea and the return elevation are reachable from the same structure. Window repairs are not a single operation on one floor. They are repeated at every opening on every storey, which means the access has to exist across the whole facade at once rather than being moved up a lift at a time.

    Roof level was sheeted and the upper lifts carry debris netting, so that work at the top of an exposed seafront building is contained rather than left open to the weather and the street below.

    The building sits in a continuous terrace with neighbouring properties hard against it on both sides, and the hotel frontage carries a canopied entrance. The scaffold had to be designed around that frontage rather than through it.

    This project utilised our commercial scaffolding, safe access scaffolding and edge protection & handrails services, delivered to our full range of industry accreditations and safety standards. The project was located in Brighton, one of our key service areas across the south coast.

    Project Challenges

    The pavement was the defining constraint. This is a busy seafront footway, and the scaffold stands on it. The structure was built to be fully pavement licence compliant, keeping safe pedestrian access along the front while meeting the local authority requirements that come with occupying a public highway.

    That is a different discipline to scaffolding a building with its own compound. Every base standard is in a place the public walks past, which is why each one is sleeved and marked, and why the footway alongside has to stay open and clear for the whole hire rather than only while the gang is on site.

    The second constraint was the building itself. A rendered terrace of this age has decorative detail at every string course, cornice and window surround, and the scaffold has to pass those without bearing on them or damaging them while still putting a working platform at every opening.

    The third was exposure. A seafront elevation takes wind straight off the Channel. Sheeting a structure increases the load the wind puts through it, so the netting and the sheeted roof level are not simply added to a standard scaffold, they are part of what the structure has to be designed to carry.

    Health & Safety

    The scaffold was built to be fully pavement licence compliant, which is the condition of standing on a public footway at all. Safe pedestrian access was maintained along the seafront throughout, and the local authority requirements were met in full.

    Base standards at pavement level were sleeved and marked so they are visible to the public passing at close quarters.

    Debris netting was fitted to the upper lifts and roof level was sheeted, containing material from the roof and window works rather than letting it reach the footway or the road.

    The scaffold was inspected at the statutory intervals for the duration of the hire. All operatives are CISRS certified.

    Key Highlights

    Full access scaffold to a prominent seafront hotel
    Window repairs reachable at every opening on every storey
    Roof level sheeted and upper lifts netted
    Fully pavement licence compliant
    Safe pedestrian access maintained along the seafront
    Base standards sleeved and marked at pavement level

    Conclusion

    The remedial programme had access to every window on every storey and to the roof, from one structure, on a building that fronts a public pavement on the Brighton seafront with no yard of its own to work from.

    Safe pedestrian access along the seafront was maintained throughout.

    Project Gallery

    The corner elevation, full height with the upper lifts netted and roof level sheeted
    The frontage past the hotel entrance, with the scaffold stepping to the neighbouring building