C.N.M Scaffolding was appointed by a repeat client to provide access scaffolding for roof repairs at St Mary's Catholic Primary School in Bognor Regis.
Most scaffolding contractors can build this scaffold. Far fewer can get on site to do it. A primary school is a safeguarding environment, and the people erecting the scaffold are working within a few metres of children. Every operative on this site was enhanced DBS checked, which is what allows the team to work appropriately within an educational environment and the reason the company gets called back to school sites rather than being ruled out at the first conversation.
The school occupies a cluster of single-storey pitched-roof blocks arranged around a central playground, with houses along the boundary on either side and a road frontage at the front. That layout leaves nowhere to work from a single compound. The scaffold had to run the full perimeter of each wing, including the inner faces looking onto the playground, and it had to do so without taking the playground out of use.
Boarded lifts with guardrails and toeboards were installed at eaves level throughout, continuing up to roof level where edge protection was needed once the main slope was opened up. Debris netting was fitted along the working edges so that material coming off the roof stayed inside the scaffold rather than reaching the playground or the gardens behind. A chimney stack mid-slope was worked around rather than enclosed.
Scaffold bases standing in the playground were enclosed in temporary fencing at ground level, the boundary between the works and the rest of the school was closed off with mesh fencing, and protective sleeving was fitted to the standards at child height.
This project utilised our safe access scaffolding, commercial scaffolding and edge protection & handrails services, delivered to our full range of industry accreditations and safety standards. The project was located in Bognor Regis, one of our key service areas across the south coast.
A primary school is not a quiet site. C.N.M describe this as a live school environment, which is the hardest version of the job: the scaffold had to stand in the playground, and the playground was not given over to the works. Only the scaffold bases were fenced off, leaving the rest of the surface, the markings and the play equipment clear. The usual approach of hoarding a working area and keeping everyone away was not available, so the separation had to be built into the scaffold rather than drawn around it.
That meant every base on the playground side was enclosed at ground level, every tube at child height was sleeved, and ladder access was fitted with a ladder guard. The structure was designed to be stood next to, not merely kept away from.
The clearance requirement comes before any of that. A school will not let an unvetted team through the gate while children are on site, and for good reason. Enhanced DBS checks across the whole team is what puts C.N.M on the list of contractors a school can actually use.
The building layout added to it. Several wings meet around a courtyard, with flat roof sections and a glazed canopy between them. Running a continuous platform across that required the scaffold to follow the building line around the courtyard rather than box it in.
Houses sit directly behind the boundary wall on either side. Material coming off an opened roof has to be contained on the scaffold rather than allowed to travel, which is why the working edges were netted rather than left open.
Every C.N.M operative working on this site was enhanced DBS checked. On a school site that is not a bonus credential, it is the condition of being allowed through the gate. C.N.M operatives are also cleared to Level 2 police vetting.
The scaffold was fully boarded at every working lift, with guardrails and toeboards. Debris netting was fitted along the working edges to contain material during the roof works.
All scaffold bases at playground level were enclosed in temporary fencing, with mesh fencing closing the boundary between the works and the school. Protective sleeving was fitted to standards at child height, and ladder access was fitted with a ladder guard.
The scaffold was inspected at the statutory intervals for the duration of the hire. All operatives are CISRS certified.
The roof repairs were carried out from a scaffold standing in the school's own playground, with the surface, the markings and the play equipment left clear around it, so the roofing works could go ahead while keeping disruption to the school to a minimum.
This was work for a repeat client. Contractors come back to scaffolders who can get onto a school site and be trusted once they are there.
Scaffolding on other live education sites, all carried out by enhanced DBS checked operatives.

Independent access scaffolding and temporary roof for school roofing works.
View Project
Independent access scaffold at a live secondary school for roof repairs.