St Michael's Church, Worthing scaffolding project in Worthing

    St Michael's Church, Worthing

    Reilly Construction LimitedWorthing6 weeksCommercial

    Project Details

    The project involved providing scaffolding for various elevations of the exterior perimeter, utilising a combination of perimeter-independent scaffolding and individual access towers. The perimeter-independent scaffolding provided a stable platform around the entire building, allowing the construction team to access and complete the remedial works efficiently. Individual access towers were strategically placed at key locations, offering secure and controlled access points around the property. This setup ensured comprehensive coverage of the exterior perimeter, making it easier for the construction team to carry out the required tasks without obstructing public access. Protection fans were installed at the entrance and exit points to ensure public safety while the property was still in use. These fans acted as a physical barrier, preventing accidental falls and minimising the risk of pedestrian injuries. Additionally, debris netting was used on the base lift of the scaffold to enhance safety and prevent any falling debris. This netting acted as an additional safeguard, capturing and containing any debris that may have fallen from the scaffold, thereby protecting the public and construction personnel. These measures were essential for maintaining a secure and safe working environment throughout the project, allowing for a smooth workflow without disrupting public access.

    This project utilised our safe access scaffolding and commercial scaffolding services, delivered to our full range of industry accreditations and safety standards. The project was located in Worthing, one of our key service areas across the south coast.

    Project Challenges

    The main challenges on this project included coordinating the installation of scaffolding around the property's busy perimeter without disrupting the public or Reilly Construction's operations. The tight space at the site and the need to ensure safety for the ongoing public and client activities added complexity to the project.

    Health & Safety

    Health and safety were paramount throughout this project. We adhered strictly to all health and safety regulations, installing protection fans and debris netting to protect both the public and construction personnel. The scaffold was regularly inspected to ensure compliance with safety standards and to prevent any potential hazards.

    Key Highlights

    Perimeter-independent scaffolding
    Individual access towers
    Protection fans at entrance/exit
    Debris netting on base lift
    6-week completion

    Conclusion

    The scaffolding provided by our team at St. Michael's Church enabled Reilly Construction Limited to complete the remedial works safely and efficiently within the 6-week timeframe. Our independent access scaffold setup allowed unobstructed access to the exterior perimeter, ensuring minimal disruption to public access and the client's operations. Key safety measures, including protection fans and debris netting, were implemented to protect the public and construction personnel. These measures and regular safety inspections ensured a secure environment throughout the project, contributing to its successful and timely completion and uninterrupted operations. This project demonstrates the importance of flexibility and stringent safety standards, particularly within sensitive environments like churches, ultimately achieving a successful outcome for both Reilly Construction Limited and Michael's Church.